# HB 730: Relating to the interconnection of large load customers and the recovery of costs of generation facilities serving large load customers by electric utilities operating outside of the ERCOT power region.

90th Legislature (90R) · House · Status: Filed

Record current as of: the Legislative Council last updated this bill's record 11/13/2026 2:00:09 AM; this site copied it 2026-11-21T22:18:17.720605Z.

How to read this page: **Official record** is copied unchanged from the Texas Legislative Council's bill files, the data behind Texas Legislature Online. **Computed by this site** is worked out by fixed rules from that record. **AI analysis (Luna)** is written by an AI model that read the bill text; it can be wrong, so check it against the bill text.

## Official record

Source: Texas Legislative Council bill files (ftp.legis.state.tx.us), copied unchanged.

- Filed: 2026-11-09
- Most recent action: 2026-11-09 · House: Filed
- Official subjects (Legislative Council index): Utilities--Electric; PUBLIC UTILITY COMMISSION
- Companion bills: none listed in the source data

### Caption

Relating to the interconnection of large load customers and the recovery of costs of generation facilities serving large load customers by electric utilities operating outside of the ERCOT power region.

### Bill text

The official wording of each version, copied from the Texas Legislative Council's bill text files and converted to Markdown with the wording unchanged. Language the bill adds is marked <ins>like this</ins>; language it removes is in [<del>brackets</del>]. To check a copy, fetch the official file and compare its SHA-256 with the one listed; the copy's own SHA-256 confirms you received it unaltered.

- Introduced: https://billatlas.org/live/text/HB730/I.md
  - Official file: ftp://ftp.legis.state.tx.us/bills/90R/billtext/HTML/house_bills/HB00700_HB00799/HB00730I.HTM, last modified 2026-11-10 18:26:19 UTC, SHA-256 c4606a9f1ba8a4e7a275237da5ef58bfbcb359a2399080158dc5993ab93a4852
  - This copy: made 2026-11-13T08:27:58.309882Z, SHA-256 of the Markdown 2b50d13593c09818762c1e91b6744c6ac018505cb7504acab523d5e10de33b8b

#### Text of the latest version (Introduced)

````markdown
# HB 730 - Introduced

By: Perez of El Paso H.B. No. 730

A BILL TO BE ENTITLED

AN ACT

relating to the interconnection of large load customers and the recovery of costs of generation facilities serving large load customers by electric utilities operating outside of the ERCOT power region.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

### SECTION 1.

Section 36.053, Utilities Code, is amended by adding Subsections (e), (f), and (g) to read as follows:

<ins>(e) In this subsection and Subsections (f) and (g):</ins>

<ins>(1) "Dedicated large load generation facility" means a generation facility, or a portion of a generation facility, that an electric utility operating solely outside of the ERCOT power region constructs, acquires, or contracts for primarily to serve one large load customer.</ins>

<ins>(2) "Large load customer" means a retail customer whose total load at a single site exceeds, or is projected to exceed, 75 megawatts. The term includes an affiliate or successor in interest of the customer.</ins>

<ins>(f) Notwithstanding Section 39.410 or any other law, the commission may not find that a dedicated large load generation facility is used by and useful to the electric utility in providing service, and the utility may not include the original cost of the facility in invested capital or otherwise recover the cost of the facility from customers other than the large load customer, unless the commission, in a proceeding for which notice is provided to each affected customer class and that is concluded before the cost is included in rates, finds that:</ins>

<ins>(1) the facility provides a net benefit to the utility's customers other than the large load customer; and</ins>

<ins>(2) the costs of the facility are allocated among customer classes in accordance with cost-causation principles and in a manner that does not cause the rates of the residential or small commercial customer classes to exceed the rates those classes would pay if the facility had not been constructed, acquired, or contracted for.</ins>

<ins>(g) The commission may make the findings described by Subsection (f) in a proceeding under Chapter 37 for a certificate of convenience and necessity for the facility or in a separate proceeding. Subsection (f) applies regardless of whether the large load customer has agreed to pay all or part of the costs of the facility for a limited period.</ins>

### SECTION 2.

Section 37.056, Utilities Code, is amended by adding Subsection (j) to read as follows:

<ins>(j) The commission may not grant a certificate for a dedicated large load generation facility, as defined by Section 36.053(e), unless the commission:</ins>

<ins>(1) makes the findings described by Section 36.053(f); or</ins>

<ins>(2) conditions the certificate on the electric utility's agreement that the costs of the facility will not be recovered from customers other than the large load customer unless the commission later makes those findings in a proceeding described by Section 36.053(f).</ins>

### SECTION 3.

Subchapter I, Chapter 39, Utilities Code, is amended by adding Section 39.411 to read as follows:

<ins>Sec. 39.411. INTERCONNECTION OF LARGE LOADS. (a) In this section, "large load customer" includes an entity requesting an interconnection that exceeds the demand threshold established under Subsection (c) and a successor in interest to such an entity.</ins>

<ins>(b) The commission by rule shall establish standards for interconnecting large load customers to an electric utility subject to this subchapter in a manner designed to support business development in this state while minimizing the potential for stranded infrastructure costs, protecting the utility's other customers from costs caused by large load customers, and maintaining system reliability.</ins>

<ins>(c) The standards apply only to a customer requesting a new or expanded interconnection where the total load at a single site would exceed 75 megawatts, unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).</ins>

<ins>(d) The standards must:</ins>

<ins>(1) require each large load customer to disclose to the electric utility whether the customer is pursuing a substantially similar request for electric service in this state or another state the approval of which would result in the customer materially changing, delaying, or withdrawing the interconnection request;</ins>

<ins>(2) set a flat study fee of at least $100,000 to be paid to the electric utility for initial transmission and generation screening studies, with any unused portion credited toward the customer's financial obligations for interconnection at the same site;</ins>

<ins>(3) include a method for a large load customer to demonstrate site control for the proposed load location through an ownership interest, lease, or another legal interest acceptable to the commission;</ins>

<ins>(4) include uniform financial commitment requirements for the development of transmission and generation infrastructure needed to serve a large load customer, which may be satisfied by security provided on a dollar per megawatt basis as set by the commission, contribution in aid of construction, advance payment for significant equipment or services, or another form of financial commitment acceptable to the commission; and</ins>

<ins>(5) provide that security posted under Subdivision (4) is refunded, in whole or in part, after application to any outstanding amounts owed, as the customer meets load ramp milestones and sustains operations for a period prescribed by the commission, if the customer withdraws all or part of its request, or if capacity subject to the commitment is reallocated to other customers.</ins>

<ins>(e) Information a large load customer submits under Subsection (d)(1) that is competitively sensitive is confidential and not subject to disclosure under Chapter 552, Government Code, except to the commission.</ins>

<ins>(f) Section 39.410 does not limit the application of the standards adopted under this section to a request for interconnection made on or after the effective date of the rules adopted under this section.</ins>

### SECTION 4.

(a) Section 36.053, Utilities Code, as amended by this Act, applies to a proceeding to change rates that is initiated on or after the effective date of this Act.

(b) Section 37.056(j), Utilities Code, as added by this Act, applies only to an application for a certificate of convenience and necessity filed on or after the effective date of this Act.

(c) The Public Utility Commission of Texas shall adopt rules under Section 39.411, Utilities Code, as added by this Act, not later than June 1, 2028.

### SECTION 5.

This Act takes effect September 1, 2027.
````

### Current law this bill changes

Each section as it stands now, from this site's copy of the Texas Legislative Council's statute files (wording unchanged); the official page is the authority. Sections are matched automatically from the bill text and can be missed, for example when a bill changes a whole chapter at once.

- Utilities Code §36.053 (amended): Sec. 36.053. COMPONENTS OF INVESTED CAPITAL.
  - This copy (whole chapter): https://billatlas.org/live/law/UT/36.md, copied 2026-11-21T02:14:24.675852+00:00, SHA-256 of the Markdown 133f4105724f8c4b4559de2bff5db82671472e0c0a6ad73c54060353ed1918ed
  - Official: https://statutes.capitol.texas.gov/Docs/UT/htm/UT.36.htm

````markdown
Sec. 36.053. COMPONENTS OF INVESTED CAPITAL. (a) Electric utility rates shall be based on the original cost, less depreciation, of property used by and useful to the utility in providing service.

(b) The original cost of property shall be determined at the time the property is dedicated to public use, whether by the utility that is the present owner or by a predecessor.

(c) In this section, the term "original cost" means the actual money cost or the actual money value of consideration paid other than money.

(d) If the commission issues a certificate of convenience and necessity or if the commission, acting under the authority formerly provided by Section 39.203(e), ordered an electric utility or a transmission and distribution utility to construct or enlarge transmission or transmission-related facilities to facilitate meeting the goal for generating capacity from renewable energy technologies under former Section 39.904(a), the commission shall find that the facilities are used and useful to the utility in providing service for purposes of this section and are prudent and includable in the rate base, regardless of the extent of the utility's actual use of the facilities.

Acts 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997.

Amended by:

Acts 2005, 79th Leg., 1st C.S., Ch. 1 (S.B. 20), Sec. 1, eff. September 1, 2005.

Acts 2023, 88th Leg., R.S., Ch. 410 (H.B. 1500), Sec. 10, eff. September 1, 2023.
````

- Utilities Code §37.056 (amended): Sec. 37.056. GRANT OR DENIAL OF CERTIFICATE.
  - This copy (whole chapter): https://billatlas.org/live/law/UT/37.md, copied 2026-11-21T02:14:24.675852+00:00, SHA-256 of the Markdown e3c32fb8abd4b8a0478f08fd1bc058cd7305aad046d6c0c2c851041cbd6e902d
  - Official: https://statutes.capitol.texas.gov/Docs/UT/htm/UT.37.htm
- Utilities Code §39.411 (added (new section))
  - New section: no current text.

### Authors and sponsors

Authors and coauthors serve in the originating chamber; sponsors and cosponsors in the other chamber. Authorship does not indicate a vote or caucus position.

#### Authors

- Vincent Perez (Democratic · HD 77 · 2 years served · since 2025) · [bills](https://agent.billatlas.org/authors/house-perez-vincent.md)

_No coauthors, sponsors or cosponsors listed: no bill in this snapshot lists any yet, so this reflects the stage of the source data, not this bill._

### Recorded actions

1. 2026-11-09: Filed

## Computed by this site

Worked out by fixed rules from the official record above; not a statement by the Legislature.

- Status: Filed
- Most recent action type: Filed
- Hearing status: No hearing yet. No committee referral or hearing has been verified. A likelihood estimate would be premature.
- Authorship: Democratic author. Authors: 1 Democratic
- Author prominence: Mid-tenure author. 2 years in the House

## AI analysis (Luna)

Written by Luna, an AI model that reads the full bill text. It can be wrong; the bill text above is the authority. Tags marked caption-rules come from keyword rules applied to the caption, not from the AI.

### Summary

Reviewed 2026-11-14T05:50:58Z · introduced text. Fields from the full text: topics, agencies, impacts, constituencies, locations; other fields use caption inference.

The bill would prevent an electric utility operating solely outside ERCOT from recovering the costs of a dedicated generation facility serving a large-load customer from other customers unless the commission makes specified net-benefit and cost-allocation findings; a certificate must include those findings or bar recovery from others until they are made. It would also require interconnection standards for large-load customers and protect from public release competitively sensitive information those customers submit under Subsection (d)(1), except to the commission.

### Topics

- Energy & utilities
- Business regulation

### Potentially affected agencies

Possible links are rule or model inferences, not confirmed legal obligations.

- **Public Utility Commission of Texas** (direct, luna-full-text): The bill expressly assigns the commission rulemaking duties and roles in cost-recovery findings and facility certificates.

### Types of impact

- Limits on recovery of dedicated-generation costs
- Conditions for generation-facility certificates
- Large-load interconnection standards
- Confidentiality of sensitive interconnection disclosures

### People and institutions affected

- Large-load customers and entities seeking large-load interconnections
- Electric utilities operating solely outside ERCOT
- Utility customers other than the large-load customer, especially residential and small commercial classes

### Locations

- ERCOT power region (utilities operating solely outside it) (defined_area): The dedicated-generation cost provisions apply to facilities for utilities operating solely outside this region.
- Texas (statewide): The interconnection standards are designed to support business development in Texas.

## Links

- Full bill text (official wording, Markdown): https://billatlas.org/live/text/HB730/I.md
- Official bill history: https://capitol.texas.gov/BillLookup/History.aspx?LegSess=90R&Bill=HB730
- Official bill text (every version, HTML/PDF/Word): https://capitol.texas.gov/BillLookup/Text.aspx?LegSess=90R&Bill=HB730
- Open in the tracker: https://billatlas.org/bill/HB730
- RSS feed of actions: https://billatlas.org/live/feeds/HB730.xml
- This page as JSON: https://agent.billatlas.org/bills/HB730.json
- Search all bills: https://agent.billatlas.org/search?q= followed by your words, e.g. https://agent.billatlas.org/search?q=Energy%20%26%20utilities

---
Unofficial, independent open-source project; not a state website. The official record and bill text on this page are copied unchanged from the Texas Legislative Council bill files, refreshed hourly, so they can trail the Legislature by up to an hour or two. Computed fields and the AI analysis can be wrong. Not legal advice. For anything that matters, confirm on Texas Legislature Online.